Steder Group Djibouti moves ball valves

Premium Content

15 August 2017

The Djibouti, Africa-based division of heavy lift and specialised transport specialist Steder Group, Steder Group Djibouti, has announced the successful completion of a transport job that involved moving two ball valves for the Genale Dawe hydro power project from the port of Djibouti, in the Horn of Africa, to the project site in Ethiopia.

The ball valve weighed 130 metric tons and the distance travelled was 1450 km. On arrival at the Genale Dawe hydro power project, Steder Group Djibouti had to transport the load through the dam’s tunnels. It reported that this was challenging but achieved successfully, and on schedule, due to careful planning and plenty of manpower.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Matt Burk VP Sales Tel: +1 773 610 9467 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA