All Lifting Articles
Five flat top tower cranes are helping to rejuvenate an industrial district of Oslo
In this spooky Site Report, ACT highlights two projects that were certifiably ghostly.
Peace of mind came directly from the crane manufacturer on a tower lift job with 81 metre luffing jib
Using two Manitowoc crawlers, the project involved building a new powerhouse and installing two generators, doubling the dam’s capacity to 4.4 megawatts.
New tower crane concepts for wind turbine installation. Part one of a series by Heinz-Gert Kessel
An early, full-scale mockup of astronaut accommodations designed for a space station orbiting the moon has been installed.
Empire Energy Partners and Sarens form one-stop-shop for offshore wind in USA
Specially modified Tadano all terrain taxi cranes prove their worth for a tandem lift by Weiland in a small space
Hong Kong-based battery manufacturer Ampd Energy is expanding globally on a promise of providing a viable alternative to diesel generators for powering tower cranes
Careful planning was among the many requirements on a tricky job to tandem lift 100 tonne trusses above a cellar
New RMG modular gantry crane at work in Indonesia as part of end to end solution
A simple tower crane solution from Marr Contracting is helping to reduce complexity on an industrial blast furnace project
120 US ton capacity rough terrain works to connect a landfill site to a renewable natural gas pipeline network
A Maeda MC815 mini crawler crane was ideal for a job at the Red Rocks Park & Amphitheatre
ICST spoke exclusively to Sarens’ commercial director of project solutions, Yannick Sel, to learn how the heavy lift giant is leading the lifting and transport work in the energy sector
First new Raimondi flat top for Hungarian rental house helping rebuild historic academy
Four units of new 40 tonne capacity hammerhead on viaduct renovation job
The crane rental company completed a one-day air exchanger swap-out project in mid-April at a large food processing facility in Iowa.
City class cranes offered the necessary agility and precision for a tricky factory lifting job
Transporting and lifting a 50 metre long, 1,500 tonne, load is not without its challenges