2,000 tonne crane assembles world’s first combined wind and aquaculture facility

An XGC28000 crawler crane from XCMG Machinery completed lifting operations at what is believed to be the world’s first combined offshore wind power and deep-sea fishery – or aquaculture – facility.


An XGC28000 crawler crane from XCMG Machinery in China completed lifting operations at what is claimed to be the world’s first combined offshore wind power and deep-sea fishery – or aquaculture – facility.

Developed by Longyuan Power Group with energy generating components from Shanghai Electric Wind Power Group, the floating…

Log in to continue reading

Log in for free access to this article and more, including:

  • Industry news and expert insight
  • Digital magazines and reports
  • Newsletters covering the topics that matter to you

If you haven’t completed your free registration yet, we’ll ask you for a few details before returning you to the article.

CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Mitchell Keller Managing Editor Tel: +1 (262) 483-3726 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA