Collett completes delivery of three wind turbines to Dragon LNG facility
03 March 2026
Collett has reported completion of a delivery involving three Enercon E-138 wind turbines to the Dragon LNG facility.
The turbines are part of a wider initiative to reduce the facility emissions. Together with the site’s solar park, the turbines will supply renewable electricity directly to the LNG terminal to lower…
CONNECT WITH THE TEAM