Goldhofer combo helps Edwards move power components

Edwards Moving & Rigging transported components that measured almost the length of a football field.

Edwards Moving & Rigging utilized its Goldhofer Faktor 5 High Girder Bridge along with 72 lines of Goldhofer THP and its four Kenworth Prime Movers to transport large power generating components to a power generation facility in Florida. The journey included travel through Broward County via US 1 and US…

Log in to continue reading

Log in for free access to this article and more, including:

  • Industry news and expert insight
  • Digital magazines and reports
  • Newsletters covering the topics that matter to you

If you haven’t completed your free registration yet, we’ll ask you for a few details before returning you to the article.

CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Mitchell Keller Managing Editor Tel: +1 (262) 483-3726 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA