ic120728.xml

Premium Content

11 April 2008

ALE executed a heavy lift for the Mega Methanol Project in Labuan, Malaysia. The UK-based company used its Gottwald MK1500 for the main lift to install a 72 m tall, 7.7 m wide, atmospheric column, weighing 495 tonnes. Total lift weight was 525 tonnes. A Demag CC 2400 was also used as a tail crane.

The MK1500 was rigged with 65 m of main boom and 23 m fixed fly jib at 10 degrees offset with 47 m back mast at 24 m radius. The installation radius was 30 m with a superlift counterweight of 500 tonnes.

Latest News
Service in motion: new path for veterans in trucking
Initiative simplifies path for veterans to enter the industry
Faymonville Group sets up North American organisation
Faymonville Group North America will be based in Little Rock, Arkansas
Overhead crane collapse at Turkish steel plant kills 17
Details of the deadly 10 November crane collapse in Türkiye
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Mitchell Keller Managing Editor Tel: +1 (262) 483-3726 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA