Responsive Image Banner

Laso moves wind farm blades

Premium Content

International transport company Laso has transported 3 wind blades, 1 nacelle and 1 hub through Malveira to the Escusa Wind Farm project in Portugal.

Laso had to transport the blades through a difficult and narrow route

The blades were 59 metres in length.

Eighteen drivers were involved with the project in addition to a technical team who helped navigate the blades through low bridges and tight curves.

Watch how Laso transported the longest blade by clicking here

Check back soon to find out more about this project.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
New vice president for Select Crane Sales
Darren Reddekopp brings more than 20 years of leadership experience
DICA expansion increases production and inventory
Headquarters gets 50,000-square-foot buildout to handle growth
Zoomlion’s first German loader cranes
Chinese manufacturer builds its first loader cranes in Germany
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Matt Burk VP Sales Tel: +1 773 610 9467 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Your VIP Pass to the World Cranes & Transport Summit

Dublin | Nov 18–19
Cap off the Summit with an exclusive Super-Premium Irish Whiskey Tasting at the historic Swan Bar.
🥃 Network with industry leaders in an intimate setting
🌍 Gain world-class insights at the conference
🍀 Experience the culture of old Dublin

I'M INTERESTED