Mammoet navigates transport paths for pipe rack placement

Mammoet was tasked with the transport and setting of six pipe rack modules in the Hartford, IL region.

Mammoet was tasked with the transport and setting of six pipe rack modules across a variety of existing infrastructure in the Hartford, IL region. This included four lanes of Illinois Highway 3, the Mississippi River levee and five railroad tracks owned by various operators. The customer wished to assemble all…

Log in to continue reading

Log in for free access to this article and more, including:

  • Industry news and expert insight
  • Digital magazines and reports
  • Newsletters covering the topics that matter to you

If you haven’t completed your free registration yet, we’ll ask you for a few details before returning you to the article.

CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Mitchell Keller Managing Editor Tel: +1 (262) 483-3726 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA