McDermott executes its heaviest lift

USA-based energy sector engineering and construction solutions provider McDermott said it “successfully executed its heaviest stacking lift” at Jebel Ali fabrication yard in Dubai, United Arab Emirates, for an offshore wind power project in Germany.

The lift was made for the BorWin6 980MW high-voltage, direct current (HVDC) project for Dutch electrical transmission operator TenneT.

Six cranes were used to stack a deck level with a total weight of 1,962 tonnes (2,163 US tons). The tandem lift was led by McDermott’s lifting fabrication team with construction…

Log in to continue reading

Log in for free access to this article and more, including:

  • Industry news and expert insight
  • Digital magazines and reports
  • Newsletters covering the topics that matter to you

If you haven’t completed your free registration yet, we’ll ask you for a few details before returning you to the article.

CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Mitchell Keller Managing Editor Tel: +1 (262) 483-3726 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA