Responsive Image Banner

Potain erects ‘Mo Mo’ in Chicago

Premium Content

15 April 2008

Crestwood, IL-based Central Contractors Service, Inc. has provided a Potain MD485 hammerhead tower crane to erect the Modern Momentum building in Chicago. Known as the “Mo Mo” project, the building is on State Street, on the site of the historic Masonic temple. Slated for completion in late 2007, the 31 floor building will have a final height of 409 feet and will be home to Chicago's Joffrey Ballet Company.

The developer and construction manager for the project is Smithfield Development and the concrete contractor is Adjustable Forms, which rented the tower crane. The architect is Booth Hansen Associates. Central Contractors Service is a subsidiary of All Erection and Crane Rental.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Tadano unveils new GTC-600-2 telescopic boom crawler crane
Tadano has introduced the GTC-600-2 telescopic boom crawler crane, replacing the GTC-550 and offering increased capacity, one-truck transport and upgraded swing performance. 
Morrow’s Peter Juhren: top-notch leadership
D.Ann Shiffler catches up with Morrow Equipment’s Peter Juhren
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Matt Burk VP Sales Tel: +1 773 610 9467 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Your VIP Pass to the World Cranes & Transport Summit

Dublin | Nov 18–19
Cap off the Summit with an exclusive Super-Premium Irish Whiskey Tasting at the historic Swan Bar.
🥃 Network with industry leaders in an intimate setting
🌍 Gain world-class insights at the conference
🍀 Experience the culture of old Dublin

I'M INTERESTED