Quay control from Watpac

Premium Content

20 February 2012

The MCA Mordant Wing was designed by Sydney architect Sam Marshall with the New South Wales Governme

The MCA Mordant Wing was designed by Sydney architect Sam Marshall with the New South Wales Government Architect

Contractor Watpac is using a Liebherr tower crane for the construction of an extension to Sydney's Museum of Contemporary Art (MCA), Australia.

Australia dealer Morrow Equipment supplied the Liebherr 280 EC-H 12 Litronic saddle jib crane, which is providing all material handling for the refurbishment and construction contract at the museum in Sydney Harbour.

The AUD$53 million (US$55 million) project at Circular Quay will create an additional 4,500 square metres of space, increasing the size of the MCA by almost 50%. The project began in August 2010 and will be completed in the first quarter 2012.

"Watpac is one of Liebherr's biggest customers in Australia, with a fleet of eight tower cranes," said Craig Jones, Morrow Equipment general manager. The company now has two 280 EC-H 12 Litronic in its fleet, as well as 180 EC-H and luffing jib 160 HC-L models.

The crane being used at MCA is a standard specification model with 12 tonnes capacity and a 75 m boom. "The building is on a long and narrow footprint, and the boom has to overfly both the quayside and the street behind. The safety requirements are therefore especially stringent," said Ernie France, Watpac equipment manager.

The MCA has consistently been voted by Sydney residents as the city's favourite museum or gallery, said Liebherr. The project will also create a National Centre for Creative Learning, comprising educational workshop spaces, facilities for young people with specific needs, a digital classroom, multimedia room, library and resource room, and a 120-seat lecture theatre.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
TII Group invests in German HQ and production facilities
TII Group inaugurated a new headquarters at its Pfedelbach site
Two Wolffkran luffing cranes tackle complex California hospital build
The US$4.3 billion project is scheduled for completion in 2030.
Engineered Rigging takes delivery of CLP LG202 lifting gantry
New addition is second US delivery for Officine CLP since country launch
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA