Record turbine blade transportation
02 September 2020
The Port of Vancouver USA used its heavylift cranes to offload a shipment of wind turbine components including what it claimed to be the longest wind turbine blades ever to enter the West Coast of the United States and be transported across North America to-date.
CONNECT WITH THE TEAM