Total moves components from Italy to India

Premium Content

Total Movements Pvt., member to the Worldwide Project Consortium (WWPC) in India, managed a door-to-door shipment from an Italian factory to India’s delivery site for 700 cubic metres of over dimensional cargo (ODC), with its heaviest piece weighing 66 tonnes.

The cargo was moved from an Italian factory to a delivery site in India

The cargo was planned to be loaded and shipped out of an Italian Port.

However, due to various infrastructural upgrades enroute and the holiday season, road permits were delayed, which affected the overall project schedule.

Since the Total Movements team monitored the operation on a daily basis, they understood the need to execute their plan B.

The team discussed with the various stakeholders involved in the shipment to start the execution by using an alternate route and shipping plan.

While it was a huge challenge to arrange for alternate permits and booking space on a suitable vessel scenario at the last minute, the team was able to achieve this on time, despite the current shortage of space onboard carriers globally.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Matt Burk VP Sales Tel: +1 773 610 9467 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

WCTS 2025

The European and Global Crane and Specialized Transport Industry Event
18 & 19 November, 2025 | Dublin, Ireland

Early bird ends July 18 – REGISTER NOW!