UK government delays Lower Thames Crossing decision until May 2025

The UK’s new Labour government has delayed a decision on whether to build a controversial 2.6-mile tunnel under the River Thames east of London.

An artists’s impression of the Lower Thames Crossing. Image: Highways Agency

In a written statement to the House of Commons this week, transport secretary, Louise Haigh, said that she had extended the decision on whether or not to build the proposed project, designed to ease congestion at London’s infamous Dartford Crossing, until 23 May 2025.

The proposed Lower Thames Crossing would link Gravesend in Kent and Tilbury in Essex, connecting the A2 and M2 with the A13.

The UK’s National Highways Agency, which oversees the country’s road network, says that the link would almost double road capacity over the river east of London to reduce congestion by taking over 13 million vehicles away every year from Dartford and free up almost a full lane of traffic.

This summer, chancellor Rachel Reeves scrapped a number of proposed infrastructure projects, including the controversial A303 Stonehenge Tunnel, as part of an effort to fill a £22 billion (US$28.8 billion) hole in the country’s public finances. However, the Lower Thames Crossing was not included on the list.

However, campaigners say the project, which is expected to cost around £9 billion (US$11.7 billion), would damage Green Belt land.

Haigh said the extension would “allow more time for the application to be considered further, including any decisions made as part of the spending review”.

This is the third time the decision has been extended, with previous dates of 20 June and 4 October having also been missed.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Niamh Marriott Deputy Editor Tel: +44 (0) 1892 786208 E-mail: [email protected]
Matt Burk VP Sales Tel: +1 773 610 9467 E-mail: [email protected]