All heerema marine contractors Articles

Mammoet to utilize Mega Jack System on TenneT’s 2GW offshore grid program
Mammoet will support Heerema Marine Contractors in the installation of two topsides for TenneT’s 2GW offshore grid program. 
Mammoet wins topsides shift and lift contract
Supporting Heerema with super heavy load skidding and lifting operations in the Netherlands
Heerema’s unusual floating turbine installation
Premium Content
First turbine installed at Arcadis Ost 1 wind farm using engineered floating installation method
Heerema claims world record offshore crane lift
Premium Content
Module weighing 17,000 tonnes lifted into place by Sleipnir super heavy lift offshore vessel
Recycled material in Lankhorst heavy lift slings for Heerema
Premium Content
LankoForce HL slings will be used on a 4-point lifting frame for an offshore lifting project