All heerema marine contractors Articles
Mammoet will support Heerema Marine Contractors in the installation of two topsides for TenneT’s 2GW offshore grid program.
Supporting Heerema with super heavy load skidding and lifting operations in the Netherlands
Premium Content
First turbine installed at Arcadis Ost 1 wind farm using engineered floating installation method
Premium Content
Module weighing 17,000 tonnes lifted into place by Sleipnir super heavy lift offshore vessel
Premium Content
LankoForce HL slings will be used on a 4-point lifting frame for an offshore lifting project