Responsive Image Banner

act040749.xml

Premium Content

25 March 2008

Heerema Marine Contractors Nederland B.V. was contracted by BP America Production Co. for the installation of six deepwater pipelines and steel catenary risers (SCR). In turn, the Bayou Companies of New Iberia, LA was contracted to insulate and fabricate the pipe that will stand up for years in what is one of the world's most inhospitable environments. The pipeline lies at a working depth somewhere between 6,000 and 7,000 feet where the pressure is more than 3,000 psi and the water temperature is 4 degrees C (37 degrees F).

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
Tadano changes European leadership
Leadership changes at the European arm of Japanese crane maker
SC&RA member spotlight: Hovago
Turning cross-border challenges into relationships
Kiskunas promoted at Dawes Rigging & Crane Rental
Joe Kiskunas replaces Scott Jerome who retired after more than 40 years
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Matt Burk VP Sales Tel: +1 773 610 9467 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Your VIP Pass to the World Cranes & Transport Summit

Dublin | Nov 18–19
Cap off the Summit with an exclusive Super-Premium Irish Whiskey Tasting at the historic Swan Bar.
🥃 Network with industry leaders in an intimate setting
🌍 Gain world-class insights at the conference
🍀 Experience the culture of old Dublin

I'M INTERESTED