Barge Master launches gangway

Premium Content

10 December 2015

The Barge Master Gangway has a modular design, allowing it to be configured to specific project need

The Barge Master Gangway has a modular design, allowing it to be configured to specific project needs

Barge Master announces the official launch of a motion compensated gangway.

The Barge Master Gangway has a modular design, allowing it to be configured to specific project needs. The model 3.0 compensates vessel motions in wave heights up to 3 metres by actively telescoping, slewing and luffing the bridge, the manufacturer said. It is designed to be compact with a small, lightweight footprint. It can be operated by one person. The model 4.5 is based on the model 3.0 with the motion compensated pedestal module added, offering an increased workability in wave heights up to 4.5 m. Both models have a lifting winch for cargo transfer up to 1,000 kg.

Martijn Koppert, Barge Master CEO, said, “The overall offshore logistics consists of safe and efficient transfer of cargo and people. While we are already known for our motion compensated lifting, customers asked us to deliver the complete package: one supplier for both cargo and people transfer. Based on the input of a team of industry experts we designed the gangway, taking into account experiences with the products already available on the market.

“We are now able to offer a Walk to Work package that matches each customer’s need,” Martijn continued. “By combining the gangway and a crane on one vessel for example, the hydraulic power unit, motion sensors, operators, spare parts and maintenance services can be shared, leading to lower costs. Besides that, the systems function as a backup of each other as well: the gangway is able to lift cargo and the crane is able to transfer people.”

The Barge Master Gangway is available for sale or can be rented.

Latest News
Bauma China 2026 hails 21% increase in visitors
The number of visitors to Bauma China, which took place in Shanghai this week (23-27 November), increased 21%
5 big talking points from Bauma China 2026
Some of the major talking points from Asia’s biggest construction machinery trade show
Mammoet moves 3,700-tonne Hamburg railway bridge in one piece
The company says it set the 3,700-tonne structure in less than 24 hours.
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Mitchell Keller Managing Editor Tel: +1 (262) 483-3726 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA