Responsive Image Banner

Ground broken on Californian high-speed rail line

Premium Content

07 January 2015

California state Governor Edmund G. Brown Jr. and other dignitaries sign a ceremonial rail at the Fr

California state Governor Edmund G. Brown Jr. and other dignitaries sign a ceremonial rail at the Fresno ground-breaking ceremony.

The California High-Speed Rail Authority held a ground-breaking ceremony for the US state’s planned high-speed line in Fresno on January 6. The ceremony was held in the city’s downtown area at the site of the future high-speed train station, and was attended by state Governor Edmund G. Brown Jr., among others.

The first phase of the work – Construction Package 1 – comprises a 29 mile (47 km) stretch of track through the city of Fresno, linking to the town of Madera to the north in California’s central valley. The design & build contract for this package was awarded to a consortium of Tutor Perini, Zachry and Parsons in April 2013, which won with a US$ 985 million bid for the work.

Speaking at the ground-breaking, California High-Speed Rail Authority chairman Dan Richard said, “We now enter a period of sustained construction on the nation’s first high-speed rail system – for the next five years in the central valley and for a decade after across California.”

Although the ground-breaking ceremony marked the official start of the project, preparatory work on Construction Package 1 has been underway since March. This has included demolition of various structures along with the finalisation of designs and land acquisitions. The contract is due for completion in 2017.

The California High-Speed Rail project is envisaged as a 1,300 km network comprising some 24 stations. It’s main aim is to link the major population centres of Los Angeles and San Francisco, with a journey time between the two cities of 2 hours 40 minutes.. Further extension would link in the state capital Sacramento in the North and San Diego in the South.

The initial 209 km segment will link Madera, to Corcoran, which is north of Bakersfield in the central valley. In 2012 the Californian Senate approved funding of US$ 6.95 billion for this part of the scheme.

The total cost of the Los Angeles to San Francisco phase of Californian high speed rail project was put at US$ 65.4 billion to US$ 74.5 billion in a 2012 study.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
New vice president for Select Crane Sales
Select Crane has named Darren Reddekopp as vice president, bringing more than 20 years of crane industry leadership to its expanding operations.
DICA expansion increases production speed and inventory levels
DICA is expanding its Urbandale, Iowa, headquarters with a 50,000-square-foot buildout designed to increase production, streamline operations and support team growth. 
Zoomlion’s first German loader cranes
Chinese manufacturer builds its first loader cranes in Germany
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Matt Burk VP Sales Tel: +1 773 610 9467 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA

Your VIP Pass to the World Cranes & Transport Summit

Dublin | Nov 18–19
Cap off the Summit with an exclusive Super-Premium Irish Whiskey Tasting at the historic Swan Bar.
🥃 Network with industry leaders in an intimate setting
🌍 Gain world-class insights at the conference
🍀 Experience the culture of old Dublin

I'M INTERESTED