Mission complete

04 March 2008

UK: Weldex Offhore, based in the UK, was tasked with completing the onshore erection of the second turbine for the Beatrice Demonstrator project, sited off the north east coast of Scotland.

The Rambiz heavy lift crane vessel, operated by Belgium based marine contractor Scaldis, took a Weldex Kobelco SL6000 crawler crane, with 48 m (157 foot) short boom, away, along with the turbine.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up