Sarens' quick reaction

Premium Content

16 September 2009

In June Sarens Polska transported a reactor from a barge to the Włocławek Chemical Plant for client ZTE Radom.

The company used the roll on/roll off method to offload the reactor onto 2 x 12 axles of Kamag self propelled modular transporter (SPMT), which included two power packs. A track, made up of steel plates, lead from the jetty to the main highway on which the Kamags made the 2 km journey to Włocławek.

The reactor weighed 329 tonnes and was 17.4 m long and 9.1 m in diameter. The Kamag operator walked backwards throughout the transportation which was completed in one day. According to Sarens Polska main engineer Mariusz Sudoł, the project drew quite a crowd, with more than 20 observers making their way to the jetty.

STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

Latest News
First Liebherr LPS crane in Africa at Port of Casablanca
Port of Casablanca is one of the largest port terminals in Africa
Tech talk: crane electrification comes of age
More and more cranes are running on electricity and suppliers are rushing to keep up
Böcker electric crane completes construction project
Electrically-powered model was well-suited for use on city centre construction site
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA