Sarens Transrig loadout

Premium Content

22 May 2008

Sarens Transrig in Norway loaded out the 10,700 tonne topside of the first Aker H.6-e drilling rig, Aker Spitsbergen in Norway. Some 448 SPMT axles were used, along with the company's ballast system and a range of supporting material for the operation.

Immediately after the load-out, the barge was positioned in an 8 SMLT (Sarens Modular Lifting Tower) set-up and the module was lifted to a height of about 34 m. The hull was then brought under and the deck was mated with it.

The combination of weight, dimensions and height made it one of the most extreme heavy lift operations ever executed, said the company. “The lifting system in the given configuration is designed for a lifting capacity of 14,400 tonnes and to withstand a full Norwegian winter storm,”

Latest News
First Liebherr LTM 1150-5.4 mobile crane delivered in the UK
New addition will operate across London and the south of England
Tadano crane reaches ‘record’ 199m hub height in Germany
German job leans on Tadano crawler for “record” height
Chinese gains reshape South American market
Chinese construction equipment manufacturers are becoming an established competitive force in South America rather than simply a low-cost alternative, according to a white paper from Off-Highway Research
CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Mitchell Keller Managing Editor Tel: +1 (262) 483-3726 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA