All Oil & Gas Articles

Super size trio: moving 3,600 tonne compressors
Alevro transported, manoeuvred and jacked down three super size heavy loads in Australia
Mammoet in 3,000 tonne load out milestone
First wind powered offshore gas platform loaded out for North Sea field
On the skids: loading in a 31,000 tonne module
Massive Brent Charlie topside module skidded in from a barge for decommissioning
Roll Group makes big lifts and moves in Indonesia
Premium Content
New RMG modular gantry crane at work in Indonesia as part of end to end solution
McAdoo chooses big RT crane for renewable gas project
Premium Content
120 US ton capacity rough terrain works to connect a landfill site to a renewable natural gas pipeline network
INTERVIEW: How Sarens is leading the energy transition
Premium Content
ICST spoke exclusively to Sarens’ commercial director of project solutions, Yannick Sel, to learn how the heavy lift giant is leading the lifting and transport work in the energy sector
Mammoet on the move with Lithuania’s heaviest load
Premium Content
Transporting and lifting a 50 metre long, 1,500 tonne, load is not without its challenges
McDermott executes its heaviest lift
Premium Content
See how much the company lifted for this offshore wind power project
Rounding up the latest specialized lifting projects
Premium Content
ACT showcases various specialized lifting and rigging jobs across North America that require the utmost in experience and practical know how.
Total Movements delivers for ADNOC
Premium Content
Super size vessels delivered from India to ADNOC refinery by Total Movements
Another new crawler crane lifting record
Premium Content
3,600 tonne capacity Zoomlion giant breaks more lifting records in China
Barnhart’s first haul into Mexico
Premium Content
The project involves the transport of 10 huge loads that originated in Yuma, AZ.
Megalift and Duck Yang transport to Panama
Premium Content
Duck Yang and Megalift deliver for terminal expansion project
18,000 tonnes moved on SPMT
Premium Content
Massive floating dock module moved on 380 axle lines of self propelled modular transporter
Sparrows signs crane and lifting contract with INEOS
Premium Content
Full gamut of lifting equipment, maintenance and other services for North Sea oil and gas provider
Roll Group adds high capacity gantry lifting system
Premium Content
New super heavy lift gantry tower system for 2,400 tonne loads to a height of 100 metres
New specialized transport company set up in India
Premium Content
Deugro establishes specialized heavy transport equipment company for its domestic market
Fagioli and Cometto load out together
Premium Content
Italian companies worked on a technical solution for load out operations
Heerema claims world record offshore crane lift
Premium Content
Module weighing 17,000 tonnes lifted into place by Sleipnir super heavy lift offshore vessel
Sarens opens new Texas facility
Premium Content
The five-acre site in Odessa will support the local oil and gas industry, as well as wind energy projects.
Load More