All astra Articles

Video | Traffic avoids roadworks thanks to ‘mobile construction site’ bridge
Premium Content
An innovative temporary bridge that allows traffic to flow over the top of it, as road resurfacing works take place underneath it, has returned to service after a revamp
Pilot mobile bridge project with Cometto
Premium Content
To avoid lane reduction during peak hours, a 240 metre mobile bridge will be built above a roadway for resurfacing in Switzerland