All richard verhoeff Articles
Mammoet will support Heerema Marine Contractors in the installation of two topsides for TenneT’s 2GW offshore grid program.
Supporting Heerema with super heavy load skidding and lifting operations in the Netherlands
Massive Brent Charlie topside module skidded in from a barge for decommissioning
Premium Content
Capacity will be 10,000 tonnes per tower on the same footprint as smaller model