Mammoet strand jacks aid nuclear reactor decommissioning

Mammoet crews assisted client Orano USA with the extraction of the sectioned 540-tonne nuclear reactor vessel (RV) at the shutdown Crystal River Unit 3 pressurized water reactor site in Florida. The removal of the RV is part of the accelerated decommissioning of the facility, which began generating electricity in 1977.…

Log in to continue reading

Log in for free access to this article and more, including:

  • Industry news and expert insight
  • Digital magazines and reports
  • Newsletters covering the topics that matter to you

If you haven’t completed your free registration yet, we’ll ask you for a few details before returning you to the article.

CONNECT WITH THE TEAM
D.Ann Shiffler Editor, American Cranes & Transport Tel: +1 512 869 8838 E-mail: [email protected]
Alex Dahm Editorial Manager Tel: +44 (0) 1892 786206 E-mail: [email protected]
Mitchell Keller Managing Editor Tel: +1 (262) 483-3726 E-mail: [email protected]
Simon Battersby Sales Manager Tel: +44 (0) 1892 786223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA