All allelys Articles
Drying cylinder lifted, transported and installed using a range of equipment
Allelys refurbished its big Gottwald pedestal crane and put it straight back to work
Who claimed victory as this year’s winner of the annual TopLift contest?
Premium Content
Specialized transport company makes equipment purchase deal
Premium Content
Specialized transport company removes and transports 7 rolling stock units from Welsh Castle
Premium Content
Victors in all ten categories of the prestigious ESTA Awards of Excellence 2024
Premium Content
Engineered solution to install large and heavy components through turbine hall roof
Premium Content
Heavy generator transported to UK power station
Premium Content
Transport company moves two 239 tonne transformers across Scotland
Premium Content
Specialist transport company delivers huge steam turbine generator to UK port
Premium Content
Transport and lifting specialist increases its heavy lifting capacity with the addition of a Gottwald AK 912
Premium Content
Allelys completes record-breaking transport to Kilroot Power Station in Northern Ireland
Premium Content
Allelys has delivered and installed four transformers to the world’s largest offshore wind farm
Premium Content
The specialized transport and heavy lift company moved and installed a 113 tonne reactor using a temporary bridge
Premium Content
More than 20 loads moved and stored by Allelys for a new waste to energy plant in the UK
Premium Content
UK heavy haulage specialist transported two historic boats from the country’s Royal Navy Fleet Air Arm Museum in Yeovilton to the Explosion Museum of Naval Firepower
Premium Content
Transport specialist Allelys tackled the removal and replacement of two 40 tonne railway trains in Barmouth, Wales