Nolte Auto-Krane deploys Liebherr MK 88
21 September 2021
The Husum harbour barrage was built in 1975 to protect against storm surges. For the inspection to take place, all water had to be removed from inside the barrage. The MK 88 placed a total of 300 stop logs and immediate posts to ensure a dry working area.
STAY CONNECTED

Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.
CONNECT WITH THE TEAM